Warning: file_put_contents(/www/wwwroot/www.1000114.com/index/temp_block/www.2000xq.com/wsuqaigvhtml.php): failed to open stream: No space left on device in /www/wwwroot/www.1000114.com/index.php on line 153
第一会所亚洲第一会所亚洲,渡边麻友毕业渡边麻友毕业

第一会所亚洲第一会所亚洲,渡边麻友毕业渡边麻友毕业

发布日期:2021年10月19日
 
Back to Case Studies第一会所亚洲第一会所亚洲,渡边麻友毕业渡边麻友毕业
Community Housing Authority

The Problem

Section 8 housing that had a extensive demolition.

Traditional Solution

Fire Walls needed to be repaired. There was extensive damage to the walls after a flood. The new code required 2 layers of gypsum and the project only had room for 1 layer.

FlameOFF® Solution

Apply fire coating to wall and ceiling areas requiring the additional rating. With the use of the Intumescent coating the problem was solvable by coating.

Estimated Savings

$63,300

Actual Time Savings

45 Calendar
Days
Have a Question?
Have a Question?

Thank you!
Your message has been successfully sent.
We will contact you very soon!